CE Certification Long Auger Drilling Rig Manufacturers, Exporter

Long auger drilling rig is a new product which is based on domestic and international advanced technology. It is a construction foundation equipment, which is not only applied for piling foundation in housing construction, but also for the traffic, energy engineering and soft base enhance, etc., Currently CFG is listed as national new method and national construction standard. lt can finish the pile in one time, perfuse pile at site and also finish the operation of placing the steel cage. Efficiency, high quality and low cost are the main advantages of this machine. Simple structure ensures flexible move, easy operation and convenience maintenance. It is applicable for clay soil, silt and fill, etc. It can pile in different complicated geological conditions such as soft soil, draft sand formation, sand and gravel layers, with groundwater and so on. Besides, it can construct cast-in-place pile, hi-pressure grouting-pile, grouting ultra-fluidized pile, CFG composite pile, pedestal pile and other ways. There is no vibration, noise and pollution during construction. It' s an excellent equipment for infrastructure construction.

Product Description

Long auger drilling rig is a new product which is based on domestic and international advanced technology. It is a construction foundation equipment, which is not only applied for piling foundation in housing construction, but also for the traffic, energy engineering and soft base enhance, etc., Currently CFG is listed as national new method and national construction standard.
It can finish the pile in one time, perfuse pile at site and also finish the operation of placing the steel cage. Efficiency, high quality and low cost are the main advantages of this machine. Simple structure ensures flexible move, easy operation and convenience maintenance.
  • Applicable Soil Conditions: Clay soil, silt, fill, soft soil, draft sand formation, sand and gravel layers with groundwater.
  • Construction Options: Cast-in-place pile, hi-pressure grouting-pile, grouting ultra-fluidized pile, CFG composite pile, pedestal pile.
  • Environmental Impact: No vibration, no noise, and no pollution during construction. An excellent equipment for infrastructure construction.
Structure Features
Power Head And Drill Tool
The power head is composed by double electronic motor, three-ring reducer and hoist frame. The axes of the reducer connect the drill tool by flange. The reducer fixes in the hoist frame and hung in the pillar rail. The drilling and piling work of reducer is completed by the hoister's drive.
Pile Frame
The pile frame is three-point support structure and the pillar connects with the machine by cross axes. This structure ensures flexible operation. The walk type chassis's move is based on the cooperation between walk cylinder and hydraulic leg and the crawler type chassis's move is based on the electronic motor and reducer. The up structure has main hoister and auxiliary hoister.
Hydraulic System
Hydraulic pump, electronic motor, oil box, outrigger cylinder, pipe and control valves compose the hydraulic system. This system controls the operation of outrigger cylinder and walk cylinder.
Electric System
Composed by electromotor, control cabin and other electric components. This system controls the electro motor's start and brake. ZL 120 model adopts frequency conversion control and realize soft starting and brake and also meets speed demand of power head and hoister.
Operation System
Operation room adopts thin board structure, three windows which ensures wide view and safety. The hydraulic system is controlled by four multiway valves, and electronic control components are inside electronic operation table or box. All operations are very convenient.
Long Auger Drilling Rig Structure Diagram
Technical Parameters
主要技术参数 Main Technical Parameters
型号 Model ZB60 ZB90 ZB120 ZL90 ZL120 ZL120 Plus
钻孔直径 Drilling Diameter 600mm 800mm 1000mm 800mm 1000mm 1000mm
最大深度 Max. drilling depth 26m 31m 35m 31m 35m 35m
动力头
Power Head
动力头型号 Type ZZSH480-60 ZZSH480-60 ZZSH580-69 ZZSH480-60 ZZSH580-69 ZZSH630-90
主电机功率 Power 2x45kw 2x55kw 2x75kw 2x55kw 2x75kw 2X110kw
输出转速 Output speed 16 r/min 16 r/min 14 r/min 16 r/min 14 r/min 11 r/min
输出最大扭矩 Max. output torque 51kN.m 55kN.m 87kN.m 55kN.m 87kN.m 190kN.m
桩架
Pile frame
桩架形式 Type 步履三支点桩架 Walking type three-point support 步履三支点桩架 Walking type three-point support 步履三支点桩架 Walking type three-point support 履带式三支点桩架 crawler type three-point support 履带式三支点桩架 crawler type three-point support 履带式三支点桩架 crawler type three-point support
行走速度 Walking speed 0.08 m/s 0.08 m/s 0.08 m/s 0.067 m/s 0.08 m/s 0.08 m/s
回转角度 Rotation angle 全回转 Full slewing 全回转 Full slewing 全回转 Full slewing 全回转 Full slewing 全回转 Full slewing 全回转 Full slewing
接地比压 Ground pressure 0.046Mpa 0.062Mpa 0.088Mpa 0.085Mpa 0.088Mpa 0.088Mpa
外型尺寸 Overall dimension 11.7x5.7x33.2m 12.5x6.0x38.2m 13.9x6.2x41.6m 12.5x6.0x38.08m 13.9x6.2x41.6m 15.7x9x43.6m
主卷扬
Main hositer
型号 Type JK5 JK8 JK8 JK8 JK8 JK8
单绳拉力 Load of single line 50kN 80kN 100kN 80kN 100kN 100kN
绳速 Rope speed 24m/min 22.5m/min 20m/min 22.5m/min 20m/min 20m/min
最大提钻力 Max pull force 400kN 640kN 640kN 640kN 640kN 800kN
副卷扬
Auxilary hoister
型号 Type JK2 JK2.5 JK3 JK2.5 JK3 JK3
单绳拉力 Load of single line 20kN 25kN 30kN 25kN 30kN 30kN
绳速 Rope speed 18m/min 18m/min 18m/min 18m/min 18m/min 18m/min
油泵
Oil pump
型号 Type CBF-E63 CBF-E63 CBF-E50 CBF-E50 CBF-E50 CBF-E60
系统压力 System pressure 16Mpa 16Mpa 16Mpa 16Mpa 16Mpa 20Mpa
总质量 Total weight 50T 55T 86T 64T 86T 120T
Frequently Asked Questions
What are the primary applications of the long auger drilling rig?
It is a construction foundation equipment widely used for piling foundations in housing construction, traffic projects, energy engineering, and soft base enhancement. It can construct cast-in-place piles, hi-pressure grouting-piles, grouting ultra-fluidized piles, CFG composite piles, and pedestal piles.
What geological conditions is this machine suitable for?
The rig is highly versatile and performs well in clay soil, silt, fill, soft soil, draft sand formations, sand and gravel layers, and environments with groundwater.
Does the construction process cause significant environmental pollution?
No, the long auger drilling rig is designed with environmental considerations in mind, generating no vibration, no noise, and no pollution during construction.
What are the core configuration features of the Power Head?
The power head is composed of a double electronic motor, a three-ring reducer, and a hoist frame. The axes of the reducer connect directly to the drill tool by a flange, providing a reliable and robust drive.
What control system is used on the ZL 120 model?
The ZL 120 model adopts advanced frequency conversion control, which realizes soft starting and braking while perfectly meeting the speed demands of both the power head and the hoister.

Related Products