CSM construction method is a new foundation construction technology that applies double-wheel milling technology to deep mixing. The principle of this process is to fully mix the original soil and inject cement slurry by rotating the two-wheel mixing head, so as to build a wall with certain mechanical properties and anti-seepage effect.
The principle of the CSM process is to fully mix the original soil and inject cement slurry by rotating the two-wheel mixing head, building a wall with specific mechanical properties and anti-seepage effects.
The CSM construction method integrates advanced hydraulic groove-milling machine technology together with deep mixing technology.
The CSM equipment can be used in soft strata like silt and sandy soil, as well as complex geological conditions including pebble layers, dense sand layers, and weathered rock layers.
It is mainly applied in foundation reinforcement, the construction of underground continuous walls, and the creation of anti-seepage walls.
Yes. According to different engineering needs, section steel can be inserted for the maintenance of deep excavation foundations or water control.